Click to enlarge, hover over image to zoom

Aqua Pro 9" Long Lead Free Packaged Magnesium Anode Rode with 3/4" Male Pipe Thread


Catalog Item # 67922
Internet SALE 
$15.21 SAVE $1.58

Reg $16.79

Have A Question About This Product?
1 Question | 1 Answer
Read All Q&A | Ask a Question | Answer a Question

Like this product?
Share it!

Add Camping World item to Wish List

Description


The single most important factor in tank life is the condition of its anode.
Aqua Pro Magnesium Anode Rods will attract the elements that cause corrosion, protecting the tank from those elements. Simply replace your MPT drain plug with the Aqua Pro Anode Rod to protect your tank. For best results the anode rod should be replaced annually.

  • For suburban and MorFlo water heaters
  • Lead free
  • 9 inches long
  • 3/4 inch male pipe thread
  • 18% more magnesium for extended protection.
  • Significantly extends the water heater tank life.
This item qualifies for Product Protection coverage! Protect Your Investment! Product Protection eliminates out-of-pocket expenses and protects against costly product repairs or replacement. We’ll cover 100% parts and labor for up to two years following the expiration of your manufacturer’s warranty. Warranty service is available at any Camping World SuperCenter.




Technical Specs


Tech Specs

Weight: Less than 1 lb.

Manufacturer: Coast Distribution System

Mfg Part #: 69716



Related Items


Items Selected: (0)


Reviews



Be the first to review this product!


Q & A



Product Question & Answer

1 questions : 1 answers
Expand All
Is the 9" measurement from end to end, or the length of the rod itself without the fitting included?
1 answer(s)




Good Sam Camping World Visa
Need help? We're here for you
chat
phone
chat now
X